|
UAK
Series - Wastewater Pumps
Free Standing Installation:
The majority of wastewater pumps are installed in chambers
constructed from pre-fabricated concrete rings. The basic
portable design (P) can be fitted with flexible hose to a
high level outlet or quick-release coupling or fixed pipework.
Guide Rail System:
Guide Rail (GR) installation is by far the most popular method
of fixing sewage pumps. A duck-foot discharge bend with special
quick-release low level coupling is bolted to the floor of
the chamber and the pump is lowered into position on two rails.
General & Electrical Specifications:


|